Track record

Designed, procured, installed, managed.

Anonymised, because most of this work is commercially sensitive to the client rather than to us. Full detail, references and figures on request.

What the bureau has done

Numbers that can be refreshed.

Each of these is a query against the platform rather than a figure from a brochure, which means it can be re-counted the day you ask.

£6.1mInvoices validated1,159 supplier invoices, checked line by line
55.8mkWh contractedAcross 256 supply contracts carrying a volume
£1.7mBilled through recharge packs128 packs built from actual meter reads
£70,360Recovered from suppliersSeven settled disputes; twenty still open
£0k£200k£400k£600k£800kNOVDECJANFEBMARMARAPRMAYJUNJULAUGSEPElectricityGasWaterOther
Supplier spend by utility, last twelve months · 21 October 2026
OPEN12£129,345 · £44,923 BACKWITH THE SUPPLIER6£257,931WITH US2£8,551WON OR PART WON9£50,248 · £25,437 BACKLOST OR WITHDRAWN2£5,437CASES · AMOUNT DISPUTED · 2026-10-21
Every dispute, by state, with the money against each
IN CONTRACT BEYOND SIX MONTHS16244%EXPIRING WITHIN SIX MONTHS6919%PAST END DATE, ON OUT-OF-CONTRACT RATES8423%NO END DATE RECORDED5415%369 SUPPLY CONTRACTS ON THE PLATFORM · 2026-10-21
Where the supply contracts sit today
Selected work

Five, across the whole chain.

Grid advisory · data centre operator 102 MVA

Capacity secured for a 50-acre site

A development site in the North East, where the connection decided whether the scheme was viable at all. Capacity strategy taken at the point it was still cheap to change, rather than discovered at energisation.

Corporate PPA · manufacturer 7.5 GWh

Sleeved from a ground-mount site 120 miles away

Generation sited where it was viable and contracted to the load that needed it, with a further 2.5 GWh generated on site. Together they cover the demand.

Energy as a Service · studio fit-out £96k a year

Saved at zero client capital

£192k of plant and metering funded and delivered, with the saving reconciled against an agreed baseline every month rather than claimed once at installation.

Procurement · mixed-use landlord 20%+

Below the previous contract on electricity

Tendered on the whole cost stack with the margin disclosed on every line. The client can see what we were paid for the work alongside what they saved.

Heat networks · residential developer 300+ homes

Resident billing across two schemes

Plus fifty-odd commercial units on the same sites. Billing from actual reads, to Ombudsman and Renters’ Rights obligations, with the calculation shown on every statement.

Also: NDA-covered advisory alongside a global agency; a seven-year power position in appraisal for a Nordic data centre operator; and EPC, carbon and option-appraisal work across offices, retail parks, logistics, hotels and residential.

How these figures are kept

If we cannot re-count it, it does not go up.

Every platform figure on this site comes from a query against production, dated on the page.

Figures from client work are anonymised and rounded, and we will walk through the workings behind any of them under NDA. If a number here cannot be reproduced from the system on the day you ask, we would rather take it down than explain it.

Where to start

We would rather find one of these in your data.

Send an invoice, a reconciliation or a capacity question you are unsure about and we will look at it properly.